It’s here!

Or rather, it’s at RBR. Rob left a message at home saying the Pino was in the shop, so I scurried over after work to check it out. It is already almost entirely assembled, and it is very, VERY green. Nobody will be able to miss us as we’re out riding.

Sometime next week, we’ll get over to the shop for Gareth’s fitting - placing the pedals at the right spot for him and then shortening the chain accordingly. After that’s done, I assume the bike is ours to take, though I need to call Make-A-Wish and see if there’s anything they want to do regarding presenting it to Gare.

We’re putting the trailer hitch on the van tomorrow, and the Draftmaster rack is now paid for and ready for pickup as well. It has all come together nicely!

If the weather holds up, we could actually be looking to ride within the next two weeks.

Apologies for the following low quality photos.  All I had on me was my cell phone.

Leave a Reply

You must be logged in to post a comment.